logo

Fairmount Reservoir N to Mission St Water Main Replacement

Sector: Water Supply and Storage • Location: Salem, Oregon, United States of America

Source: Dodge USA

Project
Pre-Design

Design and construction to upsize the aging 18-inch water main from Fairmount Reservoir to the downtown core area to a 24-inch to meet future demand. The line is located under several homes along Alta View Dr S, which runs across a steep ridge above River Rd S.

Project Information FAQ

Project Information

4 Q
The project “Fairmount Reservoir N to Mission St Water Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Salem, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Pre-Design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Design and construction to upsize the aging 18-inch water main from Fairmount Reservoir to the downtown core area to a 24-inch to meet future demand. The line is located under several homes along Alta View Dr S, which runs across a steep ridge above River Rd S.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data