logo
ProjectClosed

Fairview Drive Infrastructure Upgrades

Closed · New Brunswick · Last reported Apr 2022

Source: Dodge USA

The proposed work includes the supply and installation of approximately 345 metres of 200 mm ductile iron water main, 325 metres of 200 mm sanitary sewer main, 385 metres of various sizes of storm sewer, and includes the reconnection of service laterals, roadway granulars, roadway reinstatement, asphalt concrete, curbs and sidewalk, landscaping, and all related appurtenances.

Status
Closed
Sector
Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Steel, Commercial
Location
Fredericton, New Brunswick, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fairview Drive Infrastructure Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fairview Drive Infrastructure Upgrades” is an infrastructure initiative in the Metal sector, located in Fredericton, New Brunswick, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed work includes the supply and installation of approximately 345 metres of 200 mm ductile iron water main, 325 metres of 200 mm sanitary sewer main, 385 metres of various sizes of storm sewer, and includes the reconnection of service laterals, roadway granulars, roadway reinstatement, asphalt concrete, curbs and sidewalk, landscaping, and all related appurtenances.

Procurement method

Budget

Location

Country

Canada

State

New Brunswick

City

Fredericton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Steel, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project