logo

Fairway Drive Boat Launch Improvements

Sector: Forest Products and Packaging • Location: Gautier, Mississippi, United States of America

Source: Dodge USA

Project
Closed

These bids are invited to remove an existing asphalt boat launch and replace it with a concrete boat launch, as well as construct a timber finger pier in Gautier, Mississippi.

Status
Closed
Sector
Forest Products and Packaging, Cement, Government, Manufacturing (Industrial), Road, Commercial
Location
Gautier, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fairway Drive Boat Launch Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fairway Drive Boat Launch Improvements” is an infrastructure initiative in the Forest Products and Packaging sector, located in Gautier, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

These bids are invited to remove an existing asphalt boat launch and replace it with a concrete boat launch, as well as construct a timber finger pier in Gautier, Mississippi.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Gautier

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Cement, Government, Manufacturing (Industrial), Road, Commercial

Article published date

2024-12-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project