logo

Fairway Drive Reconstruction

Sector: Seaport • Location: Grapevine, Texas, United States of America

Source: Dodge USA

Project
Bidding

Project Description: Widening of N. Fairway Drive, between SH 26 and Marina Drive, from two lanes to three lanes. Intersection improvements are also included which consist of turn lanes, traffic signal modifications, and a new ten-foot-wide shared use path along N. Fairway Drive.

Status
Prospective
Sector
Seaport, Road, Commercial
Location
Grapevine, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fairway Drive Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fairway Drive Reconstruction” is an infrastructure initiative in the Seaport sector, located in Grapevine, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Description: Widening of N. Fairway Drive, between SH 26 and Marina Drive, from two lanes to three lanes. Intersection improvements are also included which consist of turn lanes, traffic signal modifications, and a new ten-foot-wide shared use path along N. Fairway Drive.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Grapevine

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Seaport, Road, Commercial

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project