Faith Bible Children's Building and Worship Expansion PH 2
Sector: Raw Materials • Location: Wildomar, California, United States of America
Source: Dodge USA
Phase 2 would include the expansion of the worship building to approximately 27,489 square feet with a total capacity of 1,030 seats.The finished worship building would be 34 feet 4 inches tall at the peak ofthe pitch roof. The church building would consist of the worship area with a stage, sound booth, three storage areas, lobby area, meeting room, nursery, two classrooms, group room, counseling
- Status
- Prospective
- Sector
- Raw Materials, Car parking, Automotive, Commercial, Education, Consumer Products
- Location
- Wildomar, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Faith Bible Children's Building and Worship Expansion PH 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 2 would include the expansion of the worship building to approximately 27,489 square feet with a total capacity of 1,030 seats.The finished worship building would be 34 feet 4 inches tall at the peak ofthe pitch roof. The church building would consist of the worship area with a stage, sound booth, three storage areas, lobby area, meeting room, nursery, two classrooms, group room, counseling room, work room, study area, kitchen/café, and restrooms.Phase 2 wouldalso include construction ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Wildomar |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Car parking, Automotive, Commercial, Education, Consumer Products |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
