Fall City Waste Management System
Sector: Water Supply and Storage • Location: Fall City, Washington, United States of America
Source: Dodge USA
The work includes installation of a Septic Tank Effluent Pumping (STEP) Large Onsite Sewage System (LOSS) which includes 47 parcel connections (including gravity sewer to a replaced septic pump tank and pressurized service connection), pressurized conveyance system (including flushing stations, air/vac valve, and trenchless and open cut excavation installation), treatment system (including equaliz
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes installation of a Septic Tank Effluent Pumping (STEP) Large Onsite Sewage System (LOSS) which includes 47 parcel connections (including gravity sewer to a replaced septic pump tank and pressurized service connection), pressurized conveyance system (including flushing stations, air/vac valve, and trenchless and open cut excavation installation), treatment system (including equalization, fine screening, package membrane treatment system, sludge storage, and dosing chamber), an... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
