logo
ProjectPre-Design

Fall Line Trail Segment 3B2 Rte 1 (Willis to Getting)

One of 10,000+ projects Taiyo tracks in Virginia.

Source: Dodge

Mile marker 14.0 to 15.0 (Route 1 (Willis Road - Gettings Drive), Segment 3B-2). - Part of an overall 43-mile project. The Fall Line Trail will connect Petersburg to Ashland, through the heart of Richmond. - The Chesterfield alignment of the FLT is over 17 miles long and will be constructed in multiple phases. The corridor will begin at the City of Richmond border on Route 1 to the north and will

Status
Prospective
Sector
Road, Government, Rail, Commercial, Car parking, Mass Transit, Automotive
Location
Richmond, Virginia, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Fall Line Trail Segment 3B2 Rte 1 (Willis to Getting)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fall Line Trail Segment 3B2 Rte 1 (Willis to Getting)” is an infrastructure initiative in the Road sector, located in Richmond, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Mile marker 14.0 to 15.0 (Route 1 (Willis Road - Gettings Drive), Segment 3B-2). - Part of an overall 43-mile project. The Fall Line Trail will connect Petersburg to Ashland, through the heart of Richmond. - The Chesterfield alignment of the FLT is over 17 miles long and will be constructed in multiple phases. The corridor will begin at the City of Richmond border on Route 1 to the north and will terminate at the Appomattox River to the south.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Richmond

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Government, Rail, Commercial, Car parking, Mass Transit, Automotive

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project