logo

Fall Line Trail Segment 3C-1 Rte 1 (Gettings to Dwight)

Sector: Commercial • Location: Bellwood, Virginia, United States of America

Source: Dodge USA

Project
Construction Documents

Chesterfield Fall Line Trail Segment 3C-1. Mile marker 15.0 to 15.09. (Route 1 (Gettings Lane to Dwight Avenue). Segment 3C-1 UPC/Case #: 118067 - Part of an overall 43-mile project. The Fall Line Trail will connect Petersburg to Ashland, through the heart of Richmond. - The Chesterfield alignment of the FLT is over 17 miles long and will be constructed in multiple phases. The corridor will begin

Status
Closed
Sector
Commercial, Road, Mass Transit, Rail
Location
Bellwood, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fall Line Trail Segment 3C-1 Rte 1 (Gettings to Dwight)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fall Line Trail Segment 3C-1 Rte 1 (Gettings to Dwight)” is an infrastructure initiative in the Commercial sector, located in Bellwood, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Chesterfield Fall Line Trail Segment 3C-1. Mile marker 15.0 to 15.09. (Route 1 (Gettings Lane to Dwight Avenue). Segment 3C-1 UPC/Case #: 118067 - Part of an overall 43-mile project. The Fall Line Trail will connect Petersburg to Ashland, through the heart of Richmond. - The Chesterfield alignment of the FLT is over 17 miles long and will be constructed in multiple phases. The corridor will begin at the City of Richmond border on Route 1 to the north and will terminate at the Appomattox River...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Bellwood

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Road, Mass Transit, Rail

Article published date

2024-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project