Fall River Road Pavement Rehab & Drainage Improvements
Sector: Water Supply and Storage • Location: Idaho Springs, Colorado, United States of America
Source: Dodge
Base Bid Major rehabilitation of approximately 3.3 miles of the upper (northern) portion of Fall River Road. Pavement rehab consists of approximately 1.2 miles of asphalt pavement reconstruction and approximately 2.1 miles of full-depth reclamation; followed by 5-inch HMA overlay. Other salient features include resurfaced turnouts, recycled asphalt shoulders, pavement markings, new valley inlet an
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Raw Materials, Waste Processing and Treatment, Commercial
- Location
- Idaho Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fall River Road Pavement Rehab & Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Base Bid Major rehabilitation of approximately 3.3 miles of the upper (northern) portion of Fall River Road. Pavement rehab consists of approximately 1.2 miles of asphalt pavement reconstruction and approximately 2.1 miles of full-depth reclamation; followed by 5-inch HMA overlay. Other salient features include resurfaced turnouts, recycled asphalt shoulders, pavement markings, new valley inlet and culvert, construction stormwater management, survey, and traffic control. Add Alternate #1 Road... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Idaho Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Raw Materials, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
