Fall River Water User District - Schedule 1: Pipeline
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project includes construction of approximately 20 miles of 10" HDPE (Bid Schedule 1) or 8" PVC (Bid Schedule 2) watermain, valves, crossing, prefabricated booster station, and other miscellaneous appurtenant work.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Oral, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fall River Water User District - Schedule 1: Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes construction of approximately 20 miles of 10" HDPE (Bid Schedule 1) or 8" PVC (Bid Schedule 2) watermain, valves, crossing, prefabricated booster station, and other miscellaneous appurtenant work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Oral |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
