Fallingwater Preservation Project
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Pittsburgh Post-Gazette
A massive three-year, $7 million repair project at Fallingwater is intended to fortify Frank Lloyd Wright’s architectural masterpiece for years to come. The project includes waterproofing, steel conservation, and concrete repairs to address moisture issues caused by the environment.
- Status
- Under Construction
- Sector
- Metal, Cement, Steel
- Location
- Mill Run, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Pittsburgh Post-Gazette
ConstructChat
Ask ConstructChat about Fallingwater Preservation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A massive three-year, $7 million repair project at Fallingwater is intended to fortify Frank Lloyd Wright’s architectural masterpiece for years to come. The project includes waterproofing, steel conservation, and concrete repairs to address moisture issues caused by the environment. |
Original sector | Architecture |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Mill Run |
Source
Source | Pittsburgh Post-Gazette |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Steel |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
