Fallowfield Pump Station Improvements
Sector: Water Supply and Storage • Location: Charleroi, Pennsylvania, United States of America
Source: Dodge
The Work under Contract No. 2025-02-08-1650052 generally consists of pump station rehabilitation at the Grange, Kennedy, and Pleasant Valley Pump Stations. The Work includes replacement of pumps, pump control panels, and instrumentation. The Work also includes extension of a new water service and yard hydrant at each pump station. Bidder is advised that the pumps, pump control panel, and instrumen
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Charleroi, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fallowfield Pump Station Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work under Contract No. 2025-02-08-1650052 generally consists of pump station rehabilitation at the Grange, Kennedy, and Pleasant Valley Pump Stations. The Work includes replacement of pumps, pump control panels, and instrumentation. The Work also includes extension of a new water service and yard hydrant at each pump station. Bidder is advised that the pumps, pump control panel, and instrumentation will be supplied by OWNER and installed by the CONTRACTOR. All other materials necessary f... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Charleroi |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
