Family Drive Water System Improvements
Sector: Water Supply and Storage • Location: Milford Charter Township, Michigan, United States of America
Source: Dodge USA
Project description: The Project shall consist of: i) Approximately 3,700 linear feet of 16-inch raw water transmission main from the Family Drive well site to the Water Treatment Plant (WTP) located in Milford Central Park. Portions of the raw transmission main shall be directionally drilled as indicated on the Drawings. ii) Installation, testing and start-up / commissioning of two new submersibl
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Wind, Car parking, Automotive
- Location
- Milford Charter Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Family Drive Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project description: The Project shall consist of: i) Approximately 3,700 linear feet of 16-inch raw water transmission main from the Family Drive well site to the Water Treatment Plant (WTP) located in Milford Central Park. Portions of the raw transmission main shall be directionally drilled as indicated on the Drawings. ii) Installation, testing and start-up / commissioning of two new submersible, vertical turbine pumps, with pitless adapter well caps, to be constructed at the existing casi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Milford Charter Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Wind, Car parking, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
