Famous Footwear Building
Sector: Power Generation (CCGT) • Location: Cleveland, Ohio, United States of America
Source: Dodge USA
INT/EXT ALT MAKE INTERIOR AND EXTERIOR ALTERATIONS PER APPROVED PLANS. SPECIAL INSPECTIONS REQUIRED. SEPARATE ELECTRICAL PERMIT REQUIRED. NO PLUMBING OR HVAC WITH THIS PERMIT. NO SIGNAGE WITH THIS PERMIT. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS. MAINTAIN OBC CH33/OEBC CH33 SAFEGUARDS AND OFC CH 33 FIRE SAFETY. NO EXPANSION OR CHANGE OF USE WITH THIS PERMIT.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Cleveland, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Famous Footwear Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | INT/EXT ALT MAKE INTERIOR AND EXTERIOR ALTERATIONS PER APPROVED PLANS. SPECIAL INSPECTIONS REQUIRED. SEPARATE ELECTRICAL PERMIT REQUIRED. NO PLUMBING OR HVAC WITH THIS PERMIT. NO SIGNAGE WITH THIS PERMIT. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS. MAINTAIN OBC CH33/OEBC CH33 SAFEGUARDS AND OFC CH 33 FIRE SAFETY. NO EXPANSION OR CHANGE OF USE WITH THIS PERMIT. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cleveland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
