logo
ProjectClosed

Farmington Main St Waterline Replacement

Closed · Utah · Last reported Jan 2025

Source: Dodge USA

Farmington Main St. Waterline Replacement. The Work generally consists of installation of waterline replacement pipe, ~5,200 LF of 12" and 16" C900 PVC pipe, including the replacement of existing service connections.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Government
Location
Farmington, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Farmington Main St Waterline Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Farmington Main St Waterline Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Farmington, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Farmington Main St. Waterline Replacement. The Work generally consists of installation of waterline replacement pipe, ~5,200 LF of 12" and 16" C900 PVC pipe, including the replacement of existing service connections.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Farmington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Government

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project