logo

Farmington Shepard Creek Well House Bldg

Sector: Water Supply and Storage • Location: Farmington, Utah, United States of America

Source: Dodge USA

Project
Gc Bidding

The Work generally consists of Construction of the well house, piping, and all other appurtenances required to supply to water from this source into the system. New CMU building Utility Lines Treatment Stations Piping Mechanical Electrical Asphalt Concrete Work -**The Supplier Treatment system is Specified to be Model C-2000- EARTHWORK SUBS, PLEASE SEE GEOTECH REPORT!

Status
Under Construction
Sector
Water Supply and Storage, Cement, Government, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Power Transmission, Road
Location
Farmington, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Farmington Shepard Creek Well House Bldg

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Farmington Shepard Creek Well House Bldg” is an infrastructure initiative in the Water Supply and Storage sector, located in Farmington, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work generally consists of Construction of the well house, piping, and all other appurtenances required to supply to water from this source into the system. New CMU building Utility Lines Treatment Stations Piping Mechanical Electrical Asphalt Concrete Work -**The Supplier Treatment system is Specified to be Model C-2000- EARTHWORK SUBS, PLEASE SEE GEOTECH REPORT!

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Farmington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Power Transmission, Road

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project