Farview Ave & Midland Ave Intersection Improvements
Sector: Energy Storage • Location: Paramus, New Jersey, United States of America
Source: Dodge USA
The work to be performed under this contract includes the traffic improvements, removal of median, and milling and resurfacing of Farview Avenue and Midland Avenue intersection including the upgrading of ADA curb ramps and minor sidewalk and driveway improvements.--Principal items of work in the project include: 7,370 S.Y. HMA Milling, 3 or Less 1,100 TON Hot Mix Asphalt 9.5M64 Surface Course 755
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work to be performed under this contract includes the traffic improvements, removal of median, and milling and resurfacing of Farview Avenue and Midland Avenue intersection including the upgrading of ADA curb ramps and minor sidewalk and driveway improvements.--Principal items of work in the project include: 7,370 S.Y. HMA Milling, 3 or Less 1,100 TON Hot Mix Asphalt 9.5M64 Surface Course 755 L.F. 9 x 20 Concrete Vertical Curb 1 Unit Controller, 8 Phase with Battery Backup 4 Unit Image De... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
