Faw Peninsula port project (Abdullah Khor beach)
One of 2,100 projects Taiyo tracks in Iraq.
Source: InfraPPPWorld
The project will be developed on an area of 54 km². The new facilities will have:- Container terminal of 16 km length with total capacity of 25 million container/year- Bulk terminal of 5 km length with total capacity of 55 million ton/year- General cargo terminal of 4 km length with total capacity of 4 million ton/ year- Oil derivatives terminal of 6 km length with total capacity of 230 thousand b
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Iraq
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Faw Peninsula port project (Abdullah Khor beach)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will be developed on an area of 54 km². The new facilities will have:- Container terminal of 16 km length with total capacity of 25 million container/year- Bulk terminal of 5 km length with total capacity of 55 million ton/year- General cargo terminal of 4 km length with total capacity of 4 million ton/ year- Oil derivatives terminal of 6 km length with total capacity of 230 thousand barrel/ day |
Original sector | Transport |
Budget |
Location
Country | Iraq |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
