logo

Faxinal II Small Hydro Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

Centrais Eletricas Salto dos Dardanelos S.A., a partnership of the Brazilian companies Madeireira Barra Grande Ltda (50.3%) and Magabra Agropastoril Ltda (49.4%), was awarded the contract to build and operate a 10 MW hydro power plant located in the Aripuana River, state of Mato Grosso. The company signed a 30-year concession contract with ANEEL in Novembro 2002, and the power plant was named PCH

Status
Prospective
Sector
Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Faxinal II Small Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Faxinal II Small Hydro Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Centrais Eletricas Salto dos Dardanelos S.A., a partnership of the Brazilian companies Madeireira Barra Grande Ltda (50.3%) and Magabra Agropastoril Ltda (49.4%), was awarded the contract to build and operate a 10 MW hydro power plant located in the Aripuana River, state of Mato Grosso. The company signed a 30-year concession contract with ANEEL in Novembro 2002, and the power plant was named PCH Faxinal II. In 2003, PCH Faxinal II established a power purchase agreement to sell all its output to the electricity distribution network of CEMAT. The sponsor committed to invest US$ 5.1 million (BRL 15 million) in the project, which was financed with a US$ 3.1 million (BRL 9.1 million) loan granted by the state-owned bank Banco do Brasil in 2004. The power plant commenced operations in November 2005. In April 2012, the power plant was authorized by the regulatory agency Aneel to expand its capacity to 30 MW. The investment committed to this expansion was not available. As of March 2013, construction works were underway, and operations on this new unit commenced in November 2014. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In March 2008, the company applied for carbon credits.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project