logo

Fayette Solar Farm 47.5 MW

Sector: Power Generation (CCGT) • Location: Perry Township, Ohio, United States of America

Source: Dodge USA

Project
Closed

47.5 megawatt (MW) solar energy development

Status
Closed
Sector
Power Generation (CCGT), Raw Materials, Solar, Road, Commercial
Location
Perry Township, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fayette Solar Farm 47.5 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fayette Solar Farm 47.5 MW” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Perry Township, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

47.5 megawatt (MW) solar energy development

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Perry Township

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Solar, Road, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project