Fayetteville Public Utilities Fuel Island Improvements
Sector: Water Supply and Storage • Location: Fayetteville, Tennessee, United States of America
Source: Dodge
The work of this contract comprises of: 1. Site preparation for the fuel island and fuel tanks. 2. Concrete foundations fuel island pad. 3. Minor electrical for island and canopy. 4. Furnishing and installation of equipment listed. 5. Site grading and finish grading. 6. Storm drainage.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Power Transmission, Oil and Gas
- Location
- Fayetteville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fayetteville Public Utilities Fuel Island Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this contract comprises of: 1. Site preparation for the fuel island and fuel tanks. 2. Concrete foundations fuel island pad. 3. Minor electrical for island and canopy. 4. Furnishing and installation of equipment listed. 5. Site grading and finish grading. 6. Storm drainage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Fayetteville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Power Transmission, Oil and Gas |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
