FCS RE Azito 4
One of 295 projects Taiyo tracks in Cote D'Ivoire.
Source: International Finance Corporation (IFC)
The Project consists in adding approximately 250 MW of combined-cycle gas generation units on the site of the existing 420 MW Azito power plant (the “Project”). The Project, expected to provide the Country with additional clean and low-cost power, will be developed, designed, constructed and operated under an amendment to the existing 20-year Build-Own-Operate-Transfer (“BOOT”) concession agreemen
- Status
- Prospective
- Sector
- Raw Materials, Waste Processing and Treatment, Biomass, Power Generation (CCGT), Water Supply and Storage, Geothermal, Government, Manufacturing (Industrial), Oil and Gas
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about FCS RE Azito 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists in adding approximately 250 MW of combined-cycle gas generation units on the site of the existing 420 MW Azito power plant (the “Project”). The Project, expected to provide the Country with additional clean and low-cost power, will be developed, designed, constructed and operated under an amendment to the existing 20-year Build-Own-Operate-Transfer (“BOOT”) concession agreement. The Project will sell its power to the Government of Côte d’Ivoire through CI-Energies |
Original sector | V-AB - Gas - Thermal Power Generation |
Procurement method | |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Waste Processing and Treatment, Biomass, Power Generation (CCGT), Water Supply and Storage, Geothermal, Government, Manufacturing (Industrial), Oil and Gas |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
