logo
ProjectUnder Construction

F.E. Everett Turnpike Merrimack Overpasses Replacement and Widening

Under construction · New Hampshire · Last reported Mar 2026

Source: Union Leader

The project involves replacing bridges over the F.E. Everett Turnpike in Merrimack, New Hampshire, between Exits 11 and 12. New longer bridges will be constructed parallel to the existing ones to accommodate three lanes in both directions underneath. The project is part of a long-term effort to widen the F.E. Everett Turnpike from two to three lanes to relieve traffic congestion. Temporary lane cl

Status
Under Construction
Sector
Bridge, Road
Location
Merrimack, New Hampshire, United States of America
Updated
22 Jul 2026
Source
Union Leader

ConstructChat

Ask ConstructChat about F.E. Everett Turnpike Merrimack Overpasses Replacement and Widening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “F.E. Everett Turnpike Merrimack Overpasses Replacement and Widening” is an infrastructure initiative in the Bridge sector, located in Merrimack, New Hampshire, United States. Taiyo aggregates data on it from Union Leader.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves replacing bridges over the F.E. Everett Turnpike in Merrimack, New Hampshire, between Exits 11 and 12. New longer bridges will be constructed parallel to the existing ones to accommodate three lanes in both directions underneath. The project is part of a long-term effort to widen the F.E. Everett Turnpike from two to three lanes to relieve traffic congestion. Temporary lane closures on Baboosic Lake Road and Wire Road are expected during construction. The Wire Road bridge will be removed, and the Baboosic Lake Road bridge will be replaced on its current alignment with a temporary bridge to transfer traffic during construction. The project includes moving utilities, drainage, and erosion control, with completion scheduled for fall 2028.

Original sector

Transportation

Location

Country

United States of America (USA)

State

New Hampshire

City

Merrimack

Source

Source

Union Leader

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project