FEA Nadarivatu Hydro Power Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The development objective of the Fiji Renewable Power Development Project is to help the Borrower continue to meet the growing demand for electricity in the Republic of Fiji at least cost by further developing a reliable diversified sustainable energy portfolio. In particular, the Bank will assist the Fiji Electricity Authority (FEA) in diversifying its energy portfolio to reduce its dependence o
- Status
- Failure
- Sector
- Water Supply and Storage, Power Generation (CCGT), Biomass, Tunnel, Oil and Gas, Hydro, Government
- Location
- Fiji
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about FEA Nadarivatu Hydro Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | dropped |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Fiji Renewable Power Development Project is to help the Borrower continue to meet the growing demand for electricity in the Republic of Fiji at least cost by further developing a reliable diversified sustainable energy portfolio. In particular, the Bank will assist the Fiji Electricity Authority (FEA) in diversifying its energy portfolio to reduce its dependence on diesel oil. Key indicators include (a) the renewable energy capacity (MW) added to the grid; (b) amount of actual generation added to the grid (GWh); (c) increased reliability measured by the increased number of hours that the Viti Levu Interconnected System (VLIS) and Savusavu systems are available; and (iv) the reduction in greenhouse gas emissions. This project is part of a larger FEA investment program. A recent power sector analysis has shown that the proposed investments in renewable energy generating capacity are the least cost solution for the expansion of the energy sector. Three international financial institutions (IFIs) will provide financing for the first investment package. The Asian Development Bank (ADB) will be financing the required expansion in transmission and distribution facilities, the EIB will finance FEA's equity contribution in a joint venture with Pacific Hydro Limited, which will develop the Nadarivatu run-of-river hydro facility with a capacity of 38.6 MW. The Bank will finance the expansion of the Wailoa Power Station and the development by FEA of two generation units utilizing biomass. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Fiji |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Biomass, Tunnel, Oil and Gas, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Fiji
- FIJI WATER AND WASTEWATER PROJECT
- Suva Shipyard Improvement
- Healthy Oceans and Water Security Improvement Project
- Fiji: Sustainable and Resilient Recovery Program for Fiji
- Suva Port
- Outer Islands Agricultural Development
- Flood Emergency Response Project
- Corporatization of the Water and Sewerage Section of the Ministry of Public Works, Infrastructure and Transport
