logo

Feasibility Study to Meet the Upcoming 2021 Wastewater Systems Effluent Regulation Requirements for the Red Lake Water Pollution Control Plant

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

By 2021, the Red Lake Water Pollution Control Plant that currently practices chlorination of effluent prior to discharge will need to: 1) cease chlorinating (requires permission from Ministry of Environment and Climate Change, which is unlikely due to recreational use of receiving water in Howey Bay), 2) install and utilize dechlorination to remove residual chlorine prior to discharge, or 3) switc

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Feasibility Study to Meet the Upcoming 2021 Wastewater Systems Effluent Regulation Requirements for the Red Lake Water Pollution Control Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Feasibility Study to Meet the Upcoming 2021 Wastewater Systems Effluent Regulation Requirements for the Red Lake Water Pollution Control Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

By 2021, the Red Lake Water Pollution Control Plant that currently practices chlorination of effluent prior to discharge will need to: 1) cease chlorinating (requires permission from Ministry of Environment and Climate Change, which is unlikely due to recreational use of receiving water in Howey Bay), 2) install and utilize dechlorination to remove residual chlorine prior to discharge, or 3) switch to an alternate form of disinfection (e.g., UV). The output benefit to the community is the creation of a feasibility study, which will provide the most viable solution to deal with the upcoming provincial regulations. As per subsections 6(1)(c) and 50(4) of the Wastewater Systems Effluent Regulations (SOR/2012-139) made under the Fisheries Act, the effluent quality standard for total residual chlorine (TRC) will come into force on January 1, 2021 for continuously discharging wastewater systems with an annual average daily volume of less than 5,000 m3.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project