FEED study phase for the Grand Ouest CO2 infrastructure
The status, timeline and source of this project. A free account opens every field.
Source: EU Funding & Tenders Portal
The project contributes to the implementation of PCI 13.2: Aramis – cross-border CO2 transport and storage project, intake from emitters in the hinterland of the Rotterdam harbour area, pipe transport to storage on the Dutch continental shelf. The project aims to carry out the technical studies for both the CO2 network and CO2 terminal in the Grand Ouest area in France, as well as procurement and
- Status
- Under Construction
- Sector
- Seaport, Power Generation (CCGT)
- Location
- France
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about FEED study phase for the Grand Ouest CO2 infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project contributes to the implementation of PCI 13.2: Aramis – cross-border CO2 transport and storage project, intake from emitters in the hinterland of the Rotterdam harbour area, pipe transport to storage on the Dutch continental shelf. The project aims to carry out the technical studies for both the CO2 network and CO2 terminal in the Grand Ouest area in France, as well as procurement and contracting preparations, permitting and socio-economic assessments. The project’s scope covers: • FEED CO2 network: technical studies for the pipeline network, cost evaluation, procurement documentation, as well as the safety study and the IT study; • FEED CO2 terminal: technical studies for the terminal (terminal installations and power supply), cost evaluation, procurement documentation, as well as the safety study and the integration study regarding the existing infrastructure; • Permitting: Environmental Impact Assessments (EIA), public debate, public acceptance measures and other relevant documents necessary for permitting; • Socio-economic assessment: a Cost-Benefit Analysis (CBA), financing and business plans. The project will be carried out by internal and external resources. The project’s deliverables are as follow: • FEED CO2 network complete; • FEED CO2 terminal complete; • Permit application CO2 network submitted; • Permit application CO2 terminal submitted; • Financing strategy prepared. Once the project is completed, the French part of the PCI will be ready to get administrative authorizations. |
Location
Country | France |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Seaport, Power Generation (CCGT) |
Article published date | 2026-01-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in France
- Projet 18e - Porte de Clignancourt
- Protocole d'accord RATP/Ville de Paris: création de 2000 logements d'ici 2024
- Chapelle Dubois Condorcet
- Projet 16e - 17e - Porte Maillot
- Groix BelleIle Floating Offshore Wind Farm
- Fcamp Offshore Wind Farm SeineMaritime
- Port Jérôme Refinery and Desulphurisation Plant
- Sanofi Pasteur Vaccine Plant, Val De Reuil, France
