Feeder #17 Upgrades
Sector: Power Generation (CCGT) • Location: Carthage, Missouri, United States of America
Source: Dodge USA
This project consists of adding two 2 69kV structures and repairing 0.7 miles of 13.2kV line. 477 AAC will be replacing 4/0 ACSR. Approximately twenty-five 25 wooden poles will be changes out. There will be approximately 850 feet of 500 UG AL to be installed. Boring will be required along with the installation of a three-phase padmount switch. The Owner will furnish the three- padmount switch. The
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Power Transmission, Government
- Location
- Carthage, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Feeder 17 Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of adding two 2 69kV structures and repairing 0.7 miles of 13.2kV line. 477 AAC will be replacing 4/0 ACSR. Approximately twenty-five 25 wooden poles will be changes out. There will be approximately 850 feet of 500 UG AL to be installed. Boring will be required along with the installation of a three-phase padmount switch. The Owner will furnish the three- padmount switch. The Contractor is to furnish all other materials. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Carthage |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Power Transmission, Government |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
