logo

Feira de Santana Transmission Line and Substation

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project involves the construction of a transmission line with total length of 54km and substation Fiera de Santana. The assets are located in State of Bahia, Brazil. The Sponsor is LC Energia. The project cost is BRL 100.00m (USD 17.98m), of which BRL 12.00m (USD 2.16m) was provided by Santander and two undisclosed banks have provided BRL 12.00m (USD 2.16m) and BRL 56.00m (USD 10.07m). Financi

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Feira de Santana Transmission Line and Substation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Feira de Santana Transmission Line and Substation” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of a transmission line with total length of 54km and substation Fiera de Santana. The assets are located in State of Bahia, Brazil. The Sponsor is LC Energia. The project cost is BRL 100.00m (USD 17.98m), of which BRL 12.00m (USD 2.16m) was provided by Santander and two undisclosed banks have provided BRL 12.00m (USD 2.16m) and BRL 56.00m (USD 10.07m). Financial close was announced in September 2020. https://ijglobal.com/data/transaction/52975/feira-de-santana-transmission-line-54km-and-substation

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2024-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project