Felda Global Jenka Biomass Plant
One of 10,000+ projects Taiyo tracks in Malaysia.
Source: World Bank Group
FTJ Bio Power Sdn Bhd was created to build, own and operate a 10 MW empty fruit bunch biomass power plant to be located at Jenka, Pahang, Malaysia. The project company was a joint venture between between Felda Palm Industries Sdn Bhd and Tenaga Nasional Bhd (TNB), with respective 60% and 40% equity stakes. The project is built on 4.2 hectares of land.
In October 2011, TNB signed a Power Pur
- Status
- Prospective
- Sector
- Biomass, Commercial, Wind, Consumer Products, Government, Hydro, Manufacturing (Industrial), Power Transmission, Solar, Power Generation (CCGT)
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Felda Global Jenka Biomass Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | FTJ Bio Power Sdn Bhd was created to build, own and operate a 10 MW empty fruit bunch biomass power plant to be located at Jenka, Pahang, Malaysia. The project company was a joint venture between between Felda Palm Industries Sdn Bhd and Tenaga Nasional Bhd (TNB), with respective 60% and 40% equity stakes. The project is built on 4.2 hectares of land. In October 2011, TNB signed a Power Purchase Agreement with FTJ Bio Power Sdn Bhd under the Small Renewable Energy Power (SREP) Programme. SREP allows renewable projects of up to 10 MW to sell their output to the utility, under 21-year licence agreements (tariff: 30 'sen'/kWh). Any renewable energy plant (including biomass, biogas, municipal waste, solar, mini-hydropower and wind) may apply to sell energy to the grid on a "willing seller and willing buyer" basis. The project was expected to be operational by December 2012. Estimated project cost was USD 36 million. Exact details of the transaction were not publicly available. Estimated commissioning was for December 2012. The project is reported as financial closure in December 2012, expected commissioning date. http://www.palmoilprices.net/news/felda-global-tnb-in-jv-for-biomass-plant/ http://www.bursacommunity.com/t5885-tnb-inks-21-year-deal-with-ftj-bio-power |
Original sector | Energy |
Budget |
Location
Country | Malaysia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Commercial, Wind, Consumer Products, Government, Hydro, Manufacturing (Industrial), Power Transmission, Solar, Power Generation (CCGT) |
Article published date | 2024-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
