Engineering, construction, commissioning and operation of a run-of-the-river hydropower plant at the Félou falls in Mali. A turn-key contract for the construction of the Félou plant was signed in May 2009 with Sinohydro Corp. Ltd. The construction work has been completed. The first set of generators have been installed and running in 2014 with some delays and connected to the grid. The bidding pro

Project Information FAQ

Project Information

4 Q
The project “Felou” is an infrastructure initiative in the Hydro sector, located in Mali. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Engineering, construction, commissioning and operation of a run-of-the-river hydropower plant at the Félou falls in Mali. A turn-key contract for the construction of the Félou plant was signed in May 2009 with Sinohydro Corp. Ltd. The construction work has been completed. The first set of generators have been installed and running in 2014 with some delays and connected to the grid. The bidding procedure launched in 2012 to recruit an operator for the Manantali and Félou dams and the interconnection to the load centres in Mali, Mauritania and Senegal has been unsuccessful, and the contract with the operator of Manantali ended. The promoter of the project, SOGEM had to create, in agreement with the lenders, a subsidiary (SEMAF), which took over most of the staff of the previous operator, to operate those infrastructures. The grant from the EU-AITF was used by EIB to reduce the interest rate for the three EIB loans extended to Mali, Mauritania and Senegal, allowing the three States to meet HIPC requirements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data