FENCE2 60 Winthrop ST
Open · Massachusetts
Source: City of Boston
There is an existing fence at the rear of the property that was constructed in 2012 by the developer without a permit. This work was done prior to our purchase of the property.
We are now applying for a permit for the fence. We are happy with the current design, but recognize it covers a "right of way". Our permit application and proposal includes a modification that will not interfere with the
- Status
- Prospective
- Sector
- Road, Commercial, Government
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FENCE2 60 Winthrop ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | There is an existing fence at the rear of the property that was constructed in 2012 by the developer without a permit. This work was done prior to our purchase of the property. We are now applying for a permit for the fence. We are happy with the current design, but recognize it covers a "right of way". Our permit application and proposal includes a modification that will not interfere with the "right of way" our neighbor at 12 Monument Court has over the property. Specifically, the proposed fence design would remove two sections of fence and replace with a small section of fence along the street and a gate. This would provide privacy from the street, yet keep open the area designated as a "right of way". It also keeps clear the easement area in the alley and alongside 12 Monument Court. We have included plans for current and proposed design. We have also included photos of the original chain link fence (photo from 2011), which was in place prior to the new fence going up, and our modification more closely matches that design, although offers an improvement in terms of durability and appearance. This proposal is in response to a violation notice we received and attempts to respond to that letter, the "right of way" issue, and at the same time minimize any unnecessary construction or demolition on the property. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
