Fengyang Waste-to-Energy Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project entails the construction of a 9 MW WtE plant in Fengyang County, Anhui Province. Sponsor of the project is China Everbright. Estimate project cost is around RMB 230 million or $ 34.1 million. The Fengyang Waste-to-Energy Project will be built in two phases on a build-own-operate (BOO) basis with a concession period of 30 years. On 8th June 2018, China Everbright announced that the Nati
- Status
- Prospective
- Sector
- Biomass, Commercial, Government, Waste Processing and Treatment, Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Fengyang Waste-to-Energy Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a 9 MW WtE plant in Fengyang County, Anhui Province. Sponsor of the project is China Everbright. Estimate project cost is around RMB 230 million or $ 34.1 million. The Fengyang Waste-to-Energy Project will be built in two phases on a build-own-operate (BOO) basis with a concession period of 30 years. On 8th June 2018, China Everbright announced that the National Development and Reform Commission (NDRC) has approved a grant of RMB 19.62 million for the project. Financial close took place on September 26, 2016. Acucomm files |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Commercial, Government, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
