Fenn-Gib Gold Project Processing Facility and Infrastructure Development
The owner, status and timeline of this project. A free account opens every field.
Source: Stock Titan
Mayfair Gold is advancing the Fenn-Gib Gold Project in Northern Ontario through environmental baseline studies, permitting, front-end engineering and design (FEED) for a 4,800 tpd processing facility, site investigations including geotechnical drilling and pump testing, and planning for Highway 101 realignment. The project aims for a construction decision in 2028 and initial production in 2030.
- Status
- Prospective
- Sector
- Road
- Location
- Matheson, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Fenn-Gib Gold Project Processing Facility and Infrastructure Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mayfair Gold is advancing the Fenn-Gib Gold Project in Northern Ontario through environmental baseline studies, permitting, front-end engineering and design (FEED) for a 4,800 tpd processing facility, site investigations including geotechnical drilling and pump testing, and planning for Highway 101 realignment. The project aims for a construction decision in 2028 and initial production in 2030. |
Original sector | Mining |
Budget |
Location
Country | Canada |
State | Ontario |
City | Matheson |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
