logo
ProjectProposed

Fermi America Hypergrid Project

The owner, status and timeline of this project. A free account opens every field.

Source: IndexBox

Fermi America, led by former Energy Secretary Perry, has proposed a 6,000 MW "hypergrid" project in Amarillo, Texas, combining nuclear, gas, and renewable energy sources to create a diversified power generation system.

Status
Prospective
Sector
Nuclear, Power Generation (CCGT)
Location
Amarillo, Texas, United States of America
Updated
22 Jul 2026
Source
IndexBox

ConstructChat

Ask ConstructChat about Fermi America Hypergrid Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Fermi America Hypergrid Project” is an infrastructure initiative in the Nuclear sector, located in Amarillo, Texas, United States. Taiyo aggregates data on it from IndexBox.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fermi America, led by former Energy Secretary Perry, has proposed a 6,000 MW "hypergrid" project in Amarillo, Texas, combining nuclear, gas, and renewable energy sources to create a diversified power generation system.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

City

Amarillo

Source

Source

IndexBox

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project