logo

Fern Valley Road Resurfacing

Sector: Car parking • Location: California, United States of America

Source: Riverside County

Project
Active

Limits: Fern Valley Road Resurfacing

Length: Approximately 1.7 miles

District: 4 Community: Idyllwild

PROJECT DESCRIPTION:

The Riverside County Transportation Department (RCTD) proposes to resurface approximately 1.7 mile of road. Fern Valley Rd is a local collector road that travels in the North-South direction between the project boundaries, S Circle Dr and Humber Park. Fern Valley Rd is

Project Information FAQ

Project Information

4 Q
The project “Fern Valley Road Resurfacing” is an infrastructure initiative in the Car parking sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Fern Valley Road Resurfacing Length: Approximately 1.7 miles District: 4 Community: Idyllwild PROJECT DESCRIPTION: The Riverside County Transportation Department (RCTD) proposes to resurface approximately 1.7 mile of road. Fern Valley Rd is a local collector road that travels in the North-South direction between the project boundaries, S Circle Dr and Humber Park. Fern Valley Rd is currently a two-lane facility with a road width of 26 feet. The project proposes to resurface the road, along with the construction of a retaining wall approximately 800’ before the end of the project limits near Humber Park. The section of road adjacent to the retaining wall will be reconstructed. The proposed project will also include: • Adjusting Water Valves • Adjusting Guardrail height • Reconstructing AC V-Ditch • Reconstructing AC Dike • Constructing 6” AC Dike • Placement of Shoulder Edge • Re-Application of Pavement Striping • Removing and Installing Various Signs No additional Right of Way nor Temporary Construction Easements will be required to construct the proposed improvement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data