Ferndale Avenue Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project focuses on the segment of Ferndale Avenue between Herndon Parkway in the north to Park Avenue in the south. The project aims to improve both vehicular and pedestrian safety along the corridor. Preliminary studies indicate vehicular sight distances are inadequate due to vehicular parking and the curvature of the road. Studies also indicated the potential need for additional pedestrian
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Car parking, Road, Government, Automotive
- Location
- Herndon, Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ferndale Avenue Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project focuses on the segment of Ferndale Avenue between Herndon Parkway in the north to Park Avenue in the south. The project aims to improve both vehicular and pedestrian safety along the corridor. Preliminary studies indicate vehicular sight distances are inadequate due to vehicular parking and the curvature of the road. Studies also indicated the potential need for additional pedestrian crosswalks across Ferndale Avenue. Concept plans include the use of curb bump outs as a feature t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Herndon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Car parking, Road, Government, Automotive |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
