Ferndale Park Playground Replacement
Sector: Manufacturing (Industrial) • Location: Fort Erie, Ontario, Canada
Source: Dodge
The playground redevelopment includes the removal and replacement of existing play equipment, along with the installation of rubberized protective playground surfacing. Proponents must provide a 3D rendering of the proposed design for Public Consultation.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Government, Commercial, Car parking, Automotive
- Location
- Fort Erie, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ferndale Park Playground Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The playground redevelopment includes the removal and replacement of existing play equipment, along with the installation of rubberized protective playground surfacing. Proponents must provide a 3D rendering of the proposed design for Public Consultation. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Fort Erie |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Government, Commercial, Car parking, Automotive |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
