logo

Ferrari Thermal Power Plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Active

In October 2007, the Brazilian company Ferrari Termeletrica S.A., a wholly-owned subsidiary of Grupo Ferrari, took part in a competitive bidding process organized by the regulatory agency ANEEL for the sale of the output of a 41 MW thermal power plant yet to be built in the city of Pirassununga, State of Sao Paulo. The bidding process guaranteed the company the sale of 16 MW annually in the Brazil

Project Information FAQ

Project Information

5 Q
The project “Ferrari Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2007, the Brazilian company Ferrari Termeletrica S.A., a wholly-owned subsidiary of Grupo Ferrari, took part in a competitive bidding process organized by the regulatory agency ANEEL for the sale of the output of a 41 MW thermal power plant yet to be built in the city of Pirassununga, State of Sao Paulo. The bidding process guaranteed the company the sale of 16 MW annually in the Brazilian regulated market (energy that is sold exclusively to the distribution companies). Of the remaining 25 MW, the company was set to channel 16 MW to an ethanol plant that belong to Grupo Ferrari and 9 MW could be sold in the country wholesale markets. A 35-year license contract was signed with ANEEL in July 2007. The total investment in the facility was estimated at US$ 55.6 million (BRL 101.7 million). Financial closure for the project was reached in March 2008, when the company received a US$ 36.8 million (BRL 67.3 million) loan from the state-owned bank BNDES. The financing package included US$ 25.8 million (BRL 47.3 million) from BNDES own resources; US$ 12 million (BRL 22 million) syndicated loans. The power plant commenced operations in April 2009. In 2013, the power plant was sold to Tractebel Energia, a subsidiary of GDF Suez. In December 2015, BNDES approved an additional financing of US$ 49.4 million (BRL 80.7 million) to the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data