logo

Ferrari Thermal Power Plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Active

In October 2007, the Brazilian company Ferrari Termeletrica S.A., a wholly-owned subsidiary of Grupo Ferrari, took part in a competitive bidding process organized by the regulatory agency ANEEL for the sale of the output of a 41 MW thermal power plant yet to be built in the city of Pirassununga, State of Sao Paulo. The bidding process guaranteed the company the sale of 16 MW annually in the Brazil

Status
Prospective
Sector
Geothermal, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ferrari Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ferrari Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In October 2007, the Brazilian company Ferrari Termeletrica S.A., a wholly-owned subsidiary of Grupo Ferrari, took part in a competitive bidding process organized by the regulatory agency ANEEL for the sale of the output of a 41 MW thermal power plant yet to be built in the city of Pirassununga, State of Sao Paulo. The bidding process guaranteed the company the sale of 16 MW annually in the Brazilian regulated market (energy that is sold exclusively to the distribution companies). Of the remaining 25 MW, the company was set to channel 16 MW to an ethanol plant that belong to Grupo Ferrari and 9 MW could be sold in the country wholesale markets. A 35-year license contract was signed with ANEEL in July 2007. The total investment in the facility was estimated at US$ 55.6 million (BRL 101.7 million). Financial closure for the project was reached in March 2008, when the company received a US$ 36.8 million (BRL 67.3 million) loan from the state-owned bank BNDES. The financing package included US$ 25.8 million (BRL 47.3 million) from BNDES own resources; US$ 12 million (BRL 22 million) syndicated loans. The power plant commenced operations in April 2009. In 2013, the power plant was sold to Tractebel Energia, a subsidiary of GDF Suez. In December 2015, BNDES approved an additional financing of US$ 49.4 million (BRL 80.7 million) to the project.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)

Article published date

2024-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project