Ferrocarril de Arica a La Paz - Bolivia
Distressed · La Paz
Source: World Bank Group
In September 1997, the management company Ferrocarril de Arica a La Paz (FACL) was formed to bid for a 25-year concession to operate the 206.4km railway between La Paz and the port of Arica in Northern Chile. The consortium, renamed Aministradora del Ferrocarril de Arica La Paz, won the 25-year concession contract on November 3rd, 1997. The members of the consortium are: Jose Saavedra Banzer (30%)
- Status
- Failure
- Sector
- Mass Transit, Rail, Seaport, Government, Manufacturing (Industrial)
- Location
- La Paz, Bolivia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Ferrocarril de Arica a La Paz - Bolivia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Distressed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In September 1997, the management company Ferrocarril de Arica a La Paz (FACL) was formed to bid for a 25-year concession to operate the 206.4km railway between La Paz and the port of Arica in Northern Chile. The consortium, renamed Aministradora del Ferrocarril de Arica La Paz, won the 25-year concession contract on November 3rd, 1997. The members of the consortium are: Jose Saavedra Banzer (30%), Metropolitana (Bolivia) Ltda (20%), Panamerica Securities (10%), and Empresa Ferroviaria Oriental S.A. (EFO - 40%). The EFO consortium also has the concession to operate the Oriental line (one of the two concessions created from Bolivia's state railway company). The partners contributed a total US$ 1 million of equity (divided according to their shares in the consortium). The consortium pays an annual lease fee of US$ 223,000, but must pay only 50% in year 1 and 75% in year 2. The consortium has not made any additional investment because current traffic flows do not justify it. As of 2005, FACL was having serious financial dificulties, and the train had stop operating indefinitely until they found a way out of the financial situation they were facing. None None |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Bolivia |
State | La Paz |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Seaport, Government, Manufacturing (Industrial) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Bolivia
- Empresa Ferroviaria Andina S.A.
- Empresa Ferroviaria Oriental S.A.
- Trufi Mobility Solutions
- Program for the Expansion of the Mi Teleferico Network for Sustainable and Inclusive Electric Mobility for La Paz
- Preinvestment Program for Strategic Transportation Projects
- Support for the preparation of the Solar Energy and Sustainable Electric Mobility Program for Mi Teleférico de La Paz (BO-L1229)
- Bolivia Urban Infrastructure Project
- RAILWAYS III
