logo

Ferrovia Centro Atlantica S.A.

Sector: Mass Transit • Location: Brazil

Source: World Bank Group

Project
Active

In June 1996, Ferrovia Centro Atlantica (FCA. or Tacuma Consortium) won a 30-year concession to rehabilitate and operate 7,080 km of railway line in the central-eastern region of Brazil. In 1995, the Brazilian government decided to divide the national railway, RFFSA, into six exclusive regional systems and to offer a 30-year concession contract for each system. This was one of the six concessions

Status
Prospective
Sector
Mass Transit, Government, Rail, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Ferrovia Centro Atlantica S.A.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ferrovia Centro Atlantica S.A.” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 1996, Ferrovia Centro Atlantica (FCA. or Tacuma Consortium) won a 30-year concession to rehabilitate and operate 7,080 km of railway line in the central-eastern region of Brazil. In 1995, the Brazilian government decided to divide the national railway, RFFSA, into six exclusive regional systems and to offer a 30-year concession contract for each system. This was one of the six concessions awarded between March 1996 and July 1997. Concessions were awarded on the basis of the highest bid above the government's minimum price. Concessionaires must pay an upfront lump sum, and a stream of pre-determined payments over the life of the concession. Unlike in Argentina, concessionaires have no control over initial employment decisions. The FCA consortium is headed by CVRD, which holds 45.6% of the shares throught its subsidiary Mineira Tacuma; the remaining private sponsors hold less than 15% of the shares. FCA paid R$317 million for the concession (approximately US $305 million), and will invest an US$ 300 million during the first five years of the concession. The consortium has committed to investing R$900 million over the life of the concession. In December 2000, BNDES approved a US$ 125.3 million loan to FCA, which will invest the funds in rehabilitating the rail assets. In 2003, CVRD acquired Cia Siderurgica Nacional's stake in FCA. As of December 2003, CVRD was holding 99.99% of the total shares of FCA. Between 2004 and 2006, CVRD directed US$ 488 million to FCA. Between 2009 and 2012, additional US$ 817 milllion was directed to the company's infrastructure. As of 2007, Ferrovia Centro Atlantica S.A's shares were traded on the Sao Paulo Stock Exchange Bovespa. In January 2006, ANTT approved an 165-km long extension of FCA's railway. In October 2008, The project was expected to require an investment of US$ 935 million from Vale, but approval for the construction works commencement had not been granted yet. In November 2009, construction works were set to start in the first half of 2010. The investments undertaken by FCA, year by year were: 1997 – US$ 44 million (R$ 49.2 million) 1998 – US$ 49.4 million (R$ 59.6 million) 1999 – US$ 10.2 million (R$ 53.9 million) 2000 – US$ 46 million (R$ 89.8 million) 2001 - US$ 64.6 million (R$ 143.8 million) 2002 – US$ 21.3 million (R$ 75.3 million) 2003 - US$ 38.6 million (R$ 115.8 million) 2003

Original sector

Transport

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Government, Rail, Manufacturing (Industrial)

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project