FERTILIZER DISTRIBUT
Sector: Mass Transit • Location: Indonesia
Source: World Bank Group
The project consists of investments to provide a new distribution system for the urea produced by PUSRI at plants in Palembang, Sumatra, together with other types of fertilizer which will be distributed by PUSRI totalling some 1.4 million tons per annum. Specific investments to be undertaken during the project include: acquisition of three self-unloading ships of about 7,000 dwt for bulk shipments
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of investments to provide a new distribution system for the urea produced by PUSRI at plants in Palembang, Sumatra, together with other types of fertilizer which will be distributed by PUSRI totalling some 1.4 million tons per annum. Specific investments to be undertaken during the project include: acquisition of three self-unloading ships of about 7,000 dwt for bulk shipments; expansion or improvement of three and provision of two new bulk unloading port teminals; construction of 59 inland fertilizer storage and distribution depots; provision of 175 railway wagons, four main line and three shunting locomotives, the latter being owned and operated by PJKA, and 27 railway spurs to inland storage depots; construction and procurement of office space and vehicles, technical assistance to assist and train PUSRI personnel in overall scheduling and movement control, and a study for the establishment of a National Fertilizer Distribution System. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Mass Transit projects in Indonesia
- Jakarta Bandung High-Speed Railway
- PT Metro Selular Nusantra
- PT Komselindo
- Makassar-Parepare railway line
- The construction of KA Purukcahu – Bangkuang railway, Central Kalimantan (PPP)
- Construction of Jakarta Mass Rapid Transit Project (II)
- Jakarta-Surabaya Railway Double Tracking
- Lhokseumawe- Langsa- Besitang
