Feyrer Park Roadway Improvements Project
Sector: Automotive • Location: Molalla, Oregon, United States of America
Source: Dodge USA
2 overlay of existing asphalt pavement, curb replacement, as well as extensions of various existing parking stalls to provide safer travel routes for pedestrians and vehicles within the developed recreational area. Improvements are located at NAVD88 elevations ranging between 368 to 376+/-. The total improvements result in 642.6 CY of fill volume, therefore, a cut volume equal to the cumulative fi
- Status
- Prospective
- Sector
- Automotive, Car parking, Road, Government, Commercial
- Location
- Molalla, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Feyrer Park Roadway Improvements Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2 overlay of existing asphalt pavement, curb replacement, as well as extensions of various existing parking stalls to provide safer travel routes for pedestrians and vehicles within the developed recreational area. Improvements are located at NAVD88 elevations ranging between 368 to 376+/-. The total improvements result in 642.6 CY of fill volume, therefore, a cut volume equal to the cumulative fill volume is proposed to balance the earthwork within the SFHA and not reduce flood carrying capa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Molalla |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Car parking, Road, Government, Commercial |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
