FFA Last Mile
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project is part of an ongoing effort to expand broadband access in the City of Indio. A previous phase, completed in late 2024, installed about 66,000 feet of fiber optic cable to serve unconnected homes and businesses. This new phase will extend the network by installing an additional 20,829 feet of fiber optic cable, mostly in existing conduits. Also included is installing some new two 2-in
- Status
- Prospective
- Sector
- Telecommunications, Government, Residential, Manufacturing (Industrial), Broadband, Commercial
- Location
- Indio, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FFA Last Mile
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is part of an ongoing effort to expand broadband access in the City of Indio. A previous phase, completed in late 2024, installed about 66,000 feet of fiber optic cable to serve unconnected homes and businesses. This new phase will extend the network by installing an additional 20,829 feet of fiber optic cable, mostly in existing conduits. Also included is installing some new two 2-inch conduits, vaults, fiber enclosures, and other necessary network components to connect more loc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Indio |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Government, Residential, Manufacturing (Industrial), Broadband, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
