Fiba Düzova Wind Farm
Sector: Car parking • Location: Turkey
Source: World Bank Group
Fiba Group developed the 30MW Duzova wind farm, Izmir province. Annual output was estimated at 50 GWh.
The project was commissioned in two phases, of 15MW each. The projects were commissioned in 2009 or 2010. The turbines were supplied by GE (NYSE: GE).
Total project cost was estimated at US$90 million based on US$1.8 million/MW, the average for ECA in 2011. Platts Energy in East Europe, GE
- Status
- Prospective
- Sector
- Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Automotive, Commercial
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Fiba Düzova Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fiba Group developed the 30MW Duzova wind farm, Izmir province. Annual output was estimated at 50 GWh. The project was commissioned in two phases, of 15MW each. The projects were commissioned in 2009 or 2010. The turbines were supplied by GE (NYSE: GE). Total project cost was estimated at US$90 million based on US$1.8 million/MW, the average for ECA in 2011. Platts Energy in East Europe, GE to Equip Fina Enerji Wind Parks, 16 November 2012 |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Automotive, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
