Fiber Backbone
Closed · Texas · Last reported Jul 2024
Source: Dodge USA
The City of Pearland is accepting bids from qualified vendors for the design of a new 2.64-mile fiber optic connection between City s existing network connection at the Cullen Parkway and Magnolia Parkway intersection traffic controller cabinet and extending the fiber network along Magnolia Parkway to the Magnolia Parkway / Business Center Drive intersection traffic controller cabinet. This projec
- Status
- Closed
- Sector
- Telecommunications, Broadband, Road, Government, Commercial, Residential, Manufacturing (Industrial)
- Location
- Pearland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fiber Backbone
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Pearland is accepting bids from qualified vendors for the design of a new 2.64-mile fiber optic connection between City s existing network connection at the Cullen Parkway and Magnolia Parkway intersection traffic controller cabinet and extending the fiber network along Magnolia Parkway to the Magnolia Parkway / Business Center Drive intersection traffic controller cabinet. This project will add five traffic signal controllers along Magnolia Parkway to the City s fiber optic network. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pearland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Broadband, Road, Government, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
