Fiber Optic Cabling
Bid results · Florida · Last reported Jun 2024
Source: Dodge USA
The City of Deltona is looking for a competent Contractor(s) to furnish and install fiber optic cabling and conduit.The current bid is for 36 strands of single mode fiber to be installed as per the specifications below to connect Eastern Water Reclamation Facility, 301 11th Ave, Osteen, FL to Public Works, 201 Howland Blvd, Deltona, FL. A map has been provided to show to required route of the fibe
- Status
- Closed
- Sector
- Broadband, Water Supply and Storage, Commercial, Road, Telecommunications, Government, Waste Processing and Treatment
- Location
- Osteen, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fiber Optic Cabling
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Deltona is looking for a competent Contractor(s) to furnish and install fiber optic cabling and conduit.The current bid is for 36 strands of single mode fiber to be installed as per the specifications below to connect Eastern Water Reclamation Facility, 301 11th Ave, Osteen, FL to Public Works, 201 Howland Blvd, Deltona, FL. A map has been provided to show to required route of the fiber. All fiber will be terminated end to end within each facility. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Osteen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Water Supply and Storage, Commercial, Road, Telecommunications, Government, Waste Processing and Treatment |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
