Fiber Optic Install REBID
Sector: Chemical (Industrial) • Location: Northport, Alabama, United States of America
Source: Dodge
The scope of the contract is to install fiber optic cabling and provide service at Northport Shore and its dedicated areas, described in detail below. The work requested includes new fiber construction and installation of fiber optic network cabling. Construction will include installation of fiber optic cabling in existing PVC duct banks and polymer concrete duct boxes. Services include labor, par
- Status
- Closed
- Sector
- Chemical (Industrial), Broadband, Cement, Telecommunications, Government, Manufacturing (Industrial), Commercial
- Location
- Northport, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Fiber Optic Install REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the contract is to install fiber optic cabling and provide service at Northport Shore and its dedicated areas, described in detail below. The work requested includes new fiber construction and installation of fiber optic network cabling. Construction will include installation of fiber optic cabling in existing PVC duct banks and polymer concrete duct boxes. Services include labor, parts, materials, and supplies. The scope of work should be complete by July 1, 2025. Each responden... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Northport |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Broadband, Cement, Telecommunications, Government, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
