Fiber Upgrade Phase II
Bid results · Arkansas · Last reported Jul 2024
Source: Dodge USA
This project includes providing and installing active And passive information technology equipment to Deliver 10 gigabit connectivity over single mode Fiber to remaining buildings from phase I project on The conway human development center campus in Conway, arkansas. This project will distribute cat6 Cables within each building (in conduit as required), And transferring existing cat5/cat6 cables t
- Status
- Closed
- Sector
- Commercial, Telecommunications, Manufacturing (Industrial)
- Location
- Conway, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fiber Upgrade Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes providing and installing active And passive information technology equipment to Deliver 10 gigabit connectivity over single mode Fiber to remaining buildings from phase I project on The conway human development center campus in Conway, arkansas. This project will distribute cat6 Cables within each building (in conduit as required), And transferring existing cat5/cat6 cables to new Data racks. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Conway |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Telecommunications, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
