logo

Field Testing and Calibration of a Hydrophone System for Surrogate Bedload Measurement

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Archived

Recipient and Reclamation entered into Cooperative Agreement R15AC00017 in March 2015 to measure and analyze gravel bedload in gravel–bed streams in Colorado. Assistance with acoustics, signal processing, and related software are being provided by the National Center for Physical Acoustics (NCPA) at the University of Mississippi. The NCPA has provided a field deployable hydrophone system, designed

Project Information FAQ

Project Information

4 Q
The project “Field Testing and Calibration of a Hydrophone System for Surrogate Bedload Measurement” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Recipient and Reclamation entered into Cooperative Agreement R15AC00017 in March 2015 to measure and analyze gravel bedload in gravel–bed streams in Colorado. Assistance with acoustics, signal processing, and related software are being provided by the National Center for Physical Acoustics (NCPA) at the University of Mississippi. The NCPA has provided a field deployable hydrophone system, designed and constructed with funds from the Federal Interagency Sedimentation Project (FISP). The necessary understanding for the design of such a system is a direct result of past funding by Reclamation's S&T program to investigate measurement of bedload using hydrophones as well as coordinated research provided by the Agricultural Research Service (ARS) in Oxford, MS. The original project was expected to be completed in 3 years, however, it was determined that the additional data collection and analysis is necessary for the successful completion of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data